Project Description

[one_full last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

OWNER/OCCUPANT:  Towson University

GENERAL CONTRACTOR:  Lewis Contractors

CLIENT:  Denver-Elek Inc.

DESCRIPTION:  Towson University’s Burdick Hall, home of many Campus Recreation programs and services, is currently under construction for an extensive expansion. The Burdick Expansion features a 94,000-square foot addition located on the south side of the building closest to the athletic fields. The addition will house two multi-purpose athletic courts, an elevated sprint hill, a mind and body studio for yoga and Pilates classes, a dedicated cycling studio and a combat studio. A new indoor challenge course will offer apparatus similar to those seen on the popular American Ninja Warrior television show made famous by Towson alum Kacy Catanzaro.

GSF/OSF:  94,000 square feet.

SPECIAL FEATURES:  LEED Silver certification. Two multi-purpose activity courts. An elevated sprint hill. Five studios for group fitness classes. Re-opened 33-foot climbing wall and 33-foot pinnacle. Expanded outdoor adventure trip and education center. A functional fitness course, as well as 22,000 square feet for fitness space for strength, cardio and functional training.

[/one_full][one_half last=”no” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONSTRUCTION TYPE:  New Construction / Renovation

CONTRACTORS SCOPE:  HVAC Sheet Metal Fabrication and Installation

DATE OF AWARD:  09/2015

COST AT AWARD:  $799,000

SCHEDULED COMPLETION TIME:  2017

[/one_half][one_half last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONTRACT TYPE:  Fixed Price

DATE OF COMPLETION:  Ongoing

ACTUAL COMPLETION TIME:  Ongoing

[/one_half]