Project Description

[one_full last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

OWNER/OCCUPANT: 1200 Eads ST., Inc.
Vornado/ Charles E. Smith

GENERAL CONTRACTOR:  Balfour Beatty Construction, LLC

CLIENT:  JCM Associates, Inc.

DESCRIPTION:  Metropolitan Park 4/5 is a 699-unit, 22 story residential building with ground floor retail. The project accelerates completion of the Metropolitan Park Development Plan, eliminates incompatible uses on the border of Pentagon City and Crystal City and removes an abrupt if not violent gap in the urban environment along 12th Street. Designed to maximize the activation of the 12th Street pedestrian streetscape, the grocery store includes substantial outdoor café space, transparent windows, and multiple store entrances and will serve to attract large numbers of customers throughout the neighborhood further blurring the arbitrary Eads Street boundary between Pentagon City and Crystal City. LEED Silver Certification  .

GSF/OSF:  822,755 square feet

SPECIAL FEATURES:  This building consist of 699 residential a total of 782,342 square feet of retail space, with a grocery store (Whole Foods) comprising 40,413 square feet of the ground floor. The building will incorporate multiple rooflines with a maximum proposed height of 22 stories (260.7 feet).

[/one_full][one_half last=”no” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONSTRUCTION TYPE:  New Construction/ Residential Building

CONTRACTORS SCOPE:  HVAC Sheet Metal Fabrication and Installation

DATE OF AWARD:  11/2014

COST AT AWARD:  $4,100,000.00

SCHEDULED COMPLETION TIME:  2016

[/one_half][one_half last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONTRACT TYPE:  Fixed Price

DATE OF COMPLETION:  2016

ACTUAL COMPLETION TIME:  2016

[/one_half]