Project Description

[one_full last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

OWNER/OCCUPANT:  Exelon Corporation

GENERAL CONTRACTOR:  Armada Hoeffler Construction Company

CLIENT:  Poole & Kent Corporation

DESCRIPTION:  Exelon’s new 21-story, Baltimore headquarters is located on a 27-acre waterfront parcel that used to hold the Allied Signal Chemical plant. The building holds 648,000 square feet of office, retail and residential space. The majority of the building, 444,000 square feet, is attributed to office space, while 39,000 square feet of retail is also included. The building is at the forefront of modern technological, engineering and security standards, enabling the company to work in a safe, sustainable way.

GSF/OSF:  648,000 Square Feet

SPECIAL FEATURES: LEED Platinum certification for the project’s interior fit-out, including the state-of-the-art LEED CI trading floor. The trading floor features a seamless LED video wall that emphasizes sustainability by using efficient power consumption and has a 30-year lifespan. The space also includes a “glass wall” technology room that provides complete, redundant functionality to the trading floor.

[/one_full][one_half last=”no” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONSTRUCTION TYPE:  New Construction/Renovation

CONTRACTORS SCOPE:  HVAC Sheet Metal Fabrication and Installation

DATE OF AWARD:  09/2014

COST AT AWARD:  $3,560,000

SCHEDULED COMPLETION TIME:  2017

[/one_half][one_half last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONTRACT TYPE:  Fixed Price

DATE OF COMPLETION:  Ongoing

ACTUAL COMPLETION TIME:  Ongoing

[/one_half]