Project Description

[one_full last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

OWNER/OCCUPANT: Inova Health Care Service
3300 Gallows Road
Falls Church, VA 22042

GENERAL CONTRACTOR:  Clark Construction

CLIENT:  Shapiro & Duncan, Inc

DESCRIPTION:  The Women’s Hospital and Children’s Hospital will cohabitate in a 665,000 square-foot, 12-story structure. The Women’s Hospital will contain 192 patient rooms on four floors, a 108-bed neonatal intensive care unit, 33 labor and delivery rooms, six C-section suites, and eight operating rooms. The Children’s Hospital will occupy three floors of the building, with its own dedicated entrance, and will contain 116 private pediatric rooms. The entire facility will connect to the campus’ existing South Patient Tower on the three lower levels. LEED Silver Certification

GSF/OSF:  665,000 square feet

SPECIAL FEATURES:  A new central utility plant and a central energy plant with two 1,800-ton chillers, cooling towers, and 13 custom air handling units to provide 3,300 tons of added cooling load. The hospital will be equipped with three two-megawatt emergency generators with paralleling gear to provide continuous electricity in the event of an emergency.

[/one_full][one_half last=”no” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONSTRUCTION TYPE:  New Construction/ Hospital

CONTRACTORS SCOPE:  HVAC Sheet Metal Fabrication and Installation

DATE OF AWARD:  09/2012

COST AT AWARD:  $7,000,000.00

SCHEDULED COMPLETION TIME:  36 Months

[/one_half][one_half last=”yes” spacing=”yes” center_content=”no” hide_on_mobile=”no” background_color=”” background_image=”” background_repeat=”no-repeat” background_position=”left top” hover_type=”none” link=”” border_position=”all” border_size=”0px” border_color=”” border_style=”” padding=”” margin_top=”” margin_bottom=”” animation_type=”” animation_direction=”” animation_speed=”0.1″ animation_offset=”” class=”” id=””]

CONTRACT TYPE:  Fixed Price

DATE OF COMPLETION:  09/2015

ACTUAL COMPLETION TIME:  36 Months

[/one_half]